So the day has come at last.
I have finished the “News programme” which I have been working on for the last 2 years, meaning we can proceed with the rest of things to do on the List There is one mistake I noticed at the premiere which I can fix quite easily but it has fulfilled it’s purpose. So as it stands, there is only two side-projects that I need to do before I start working on the new Mullafacation website (at last) which is fixing the Trench in MullMC which I promised I would do and doing the Epic Pug & Epic Slug video I was talking about earlier.
I had this mad frenzy of completing it because I set a date for when it was to be completed so for about 1 or 2 days I worked on it a LOT and I put everything else secondary, like the Trench, which needs to be finally repaired once and for all (don’t worry, you’ll get a MullMC database when it comes out telling you what all these stuff are, because by the time you get to play it on the opening day, the Trench will be gone.)
I’m also planning on making time for the Vent projects so that I can get things done while not just solidly working on them which never works. But no matter how slowly we move (which is why I’m rightfully named Epic Slug) we will get there in the end. That should be my catchphrase. 😀